Present: Gandolf, Sam, rachel, Ken, Lucea, Julie, Grant, Raul, Michal, mike, lynne
Studios - evrything is good, Nix has cleared the fire exits. all studios are full, all artists have paid, all bar one are up to date with volunteer hours. ≈
Cave -
It is open. All equipment is working, one PA speaker is broke, Owen has ordered component and will fit it. Cave booked approx a third of the time.
BookingSystem will be re-written.
Proposal accepted: Morning rental is 3 hours from 10am to 1pm for price of 2 hours.
Darkroom -
meetings every tue.
pinhole Day 25th April, informal workshop 20th march, everyone would come and make a simple pinhole camera.
screenprint -
it will move into CraftyRoom. There will be an action day soon...
Woodwork. -
Still need a list of tools needed, still need to move the metal work stuff out.
Need to keep the power tools cabinet looked.
Proposal accepted: a list of people that are deemed compitent will be created and only these people will be given access to the power tools key. Ken, Nix, Gandolf, Jude, Jamie, mike, rachel. Sam. - any two of these people can add a new person to the list.
AP: rachel to create actionpoint scedule to improve functionality.
AP: nix to speak to Matt about moving Bike gen stuff. and will make sure
AP: Ken to get screws & screw table together.
Hall -
Proposal: The hall is an ArtistFacility. we offer to bring the Hall Project into the Artist Facilities Working Group, subject to ForestWorkingGroup approval.
Multi core, we have a 24chanel desk and a dodgy 6 channel Multicore.
we need more. 15m? 8 (or more) channels? XLR, should be portable.
lockable box for mics etc.
Blackout Curtains.
AP: Gandolf to measure the windows.
Hall action day.
AP: Mike. explore what activities are limited by Forest insurance.
AP: Mike to find solutions to buzzword issues
Artists Facilities Meeting 3 March 10
Re: Artists Facilities Meeting 3 March 10
what part of the hall, above and beyond AF Sound Team equipment maintenance, would now be an AF responsibility? fixing windows/wiring/etc i take it? was there anyone specifically responsible for this before, or is this just a responsibility boundary/framework that wasn't explicitly stated before?
on screenprint - can anyone confirm what the situation is with rescheduling workshops from the Crafty Room to the Action Room? has gio fillled lukas in on this?
on the cave - what's the situation with the return of the Forest Jam?
on screenprint - can anyone confirm what the situation is with rescheduling workshops from the Crafty Room to the Action Room? has gio fillled lukas in on this?
on the cave - what's the situation with the return of the Forest Jam?
hey, if you don't like it, post on the BB (so you can ask about participating for better) | MilkMiruku
Re: Artists Facilities Meeting 3 March 10
The Hall has always been an Admin/Building Manager responsibility. But now "Forest Up Venue coordinator" is an EVS role. Bookings, promotion, maintainance are now their responsibility. There will be a "formal" project outline soon.milk wrote:what part of the hall, above and beyond AF Sound Team equipment maintenance, would now be an AF responsibility? fixing windows/wiring/etc i take it? was there anyone specifically responsible for this before, or is this just a responsibility boundary/framework that wasn't explicitly stated before?
thanks!
Re: Artists Facilities Meeting 3 March 10
Measurements of curtain sizes for hall windows:
3 windows:
6 metres high x 3.6 m wide
This is for a single curtain across the widest part of each opening and overlapping wall on sides, above and below.
1 window (mostly obscured by balcony):
top: 2m high (above balcony)
bottom: 2.3m high (below balcony)
This is for a single curtain across the widest part of each opening and overlapping wall on sides, above and below.
Note: If curtains are to be 2 pieces opening centrally there needs to be an additional overlap.
Gandolf
3 windows:
6 metres high x 3.6 m wide
This is for a single curtain across the widest part of each opening and overlapping wall on sides, above and below.
1 window (mostly obscured by balcony):
top: 2m high (above balcony)
bottom: 2.3m high (below balcony)
This is for a single curtain across the widest part of each opening and overlapping wall on sides, above and below.
Note: If curtains are to be 2 pieces opening centrally there needs to be an additional overlap.
Gandolf
Re: Artists Facilities Meeting 3 March 10
About the black out curtains, is there anyone who is up for ? good at finding grants for the costs of the curtains aswell as a good and cheap place to make them?
would be great if someone hade some nice advice or was up for doing it
cheers
cornelia
would be great if someone hade some nice advice or was up for doing it
cheers
cornelia
tack och hej leverpastej
Re: Artists Facilities Meeting 3 March 10
the feeling from past AF Meetings was..."if there is a responsible person willing to be there for the entirety of the session, and lead it as a constructive workshop, then it could happen"what's the situation with the return of the Forest Jam?